Kavakçalı HPP

Kavakçalı HPP

Please fill out the form to get in touch with the project developers.

Project Information

Est. annual mitigations

22,354t CO2-e

Project Status
Under validation
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
AMS-I.D.
Project Description

The project is a greenfield hydropower plant with an installed capacity of 11.143 MWe. The start date of project is 29/03/2013 that is the starting date of the operation. The installed capacity is 11.446 MWm/ 11,143 MWe. The project started generating electricity and feeding it into the national grid on 29/03/2013. The project is located at the Namnam River in Fethiye district, in Muğla Province with connection to the Muğla transformer center through a transmission line. The project is expected to generate 44,289 MWh of clean energy per annum. The estimated CO2 emission reductions is 24,589 tCO2e. The total crediting period of the project activity is 10 years and the corresponding emission reductions for the whole period is 245,890 tCO2e. The project’s monitoring period is between 29/03/2013 to 28/03/2023– both days included.

Validation Criteria
ISO 14064-2:2019
Other - Please specify
Applied methodology
ICR requirements v4.0
Validation Body

Validation Criteria
ISO 14064-2:2019
Applied methodology
ICR requirements v4.0
Other - Please specify
Project design description

Media

...
...
...

Location

Country
Turkey
City
N/A
Address
N/A
Geographical Region
Asia
Coordinates
37.2178776, 28.3645937