ICR
Under validation
ID: 344

Ral Enerji G-4 Viranşehir-9-SPP

Ral Enerji G-4 Viranşehir-9-SPP

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

The G4-Viranşehir-9-SPP project is planned to be implemented by Ral Enerji in Şanlıurfa Province, Viranşehir, Kadıköy District / Turkey. Within the scope of the project, it is planned to install 32,424 solar panels with 540W power, 37,632 solar panels with 545W power and 50,400 solar panels with 550W power. The maximum annual electricity production amount of the project is planned to be 100,000,000 kWh per year.

Validation Body
Validation Criteria
ISO 14064-2:2019
ICR requirements v6.0
Applied methodology
Other - Please specify
Verification Body

Verification Criteria

Media

Location

Country
Turkey
City
Şanlıurfa
Address
Viranşehir District, Kadıköy Neighborhood, 0 Block, 181 parcel
Geographical Region
Asia
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
63K
t CO₂e per year
Est. Total
317K
t CO₂e
Crediting Start Date
MAR 1 '25
Crediting Period
5 Years

Sustainable Developement Goals

Gender Equality

Achieve gender equality and empower all women and girls

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Level 5 additionality

Policy additionality. Implementation of actions may lie out of the scope of the host country's Nationally Determined Contributions under the Paris Agreement and, therefore, not eligible for international transfer mechanism. When project implementation goes beyond its host country’s climate objectives and lies outside of the scope of its climate action strategy towards its NDCs, it is considered to be policy additional.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

Ral Enerji A.Ş.

Project Owner

Project Proponent

Globia Çevre Yatırım Danışmanlık ve Mühendislik Sanayi ve Ticaret Limited Şirketi

Project Developer

Project Developer

profile picture

Applus+ Certification

Verification Body

Validation Verification Body

People involved in the project

İbrahim Özyurt

Project Participant
profile picture

Agustín Calle de Miguel

Auditor
Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

Project description

1 documents

Validation Plan

1 documents