back to projects
validated

LFG management project for 2nd phase of Liulitun landfill in Haidian District

Fetching project credits

Location
Beijing
Project type
Avoidance / Reduction
Project status
validated
Methodology
ACM0001
Sector
Waste handling and disposal

Location

Beijing
100192
Loading...

Lat=39° 57' 6.68" N

Lng=116° 27' 22.04" E

Project description

The LFG management project for second phase of Liulitun landfill in Haidian District is invested and owned by Beijing Huatairunda Energy Saving Technology Co.Ltd. The project captures the landfill gas that would have been released to the atmosphere in the absence of the project and generates electricity with the landfill gas (LFG). Emission reductions by the project would be claimed from the methane destruction by gas engines through LFG consumption and electricity replacement by 10MW (5X2MW) internal combustion engine generators through electricity generation. The largest power generation would be 72,000MWh and of which 64,800MWh would be supplied to the North China Power Grid. It is estimated that annual average 152,550 tCO2e emissions and totally 1,067,851 tCO2e emissions could be reduced in the first 7-year crediting period. Project 9413 - Transitioned from CDM.

Latest insights

Nothing here yet?

It's time to shape the story of your project or organization by providing your first valuable insight.