The Project is a greenfield project with a total installed capacity of 60MW consisting of 2×30 MW units. The annual biomass residue consumption of the Project is 306,600 tonnes, expected annual operating hours is 6,000 hours per annum with resulting expected annual electricity generation of 360,000 MWh per annum. The plant load factor(PLF) equals to 68.49%. Of this generation figure, 318,600 MWh is expected to be delivered net of auxiliary power use to the Guangdong power grid, part of the China Southern Power Grid (CSPG).
Media
Sustainable Developement Goals

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Participants
Version | File size | ||||
|---|---|---|---|---|---|
Project description 1 documents | |||||
Validation report 1 documents |