Maren KCS Geothermal Bundle

Maren KCS Geothermal Bundle

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Under development
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ISO 14064-2
Project Description

Project activity is a geothermal power plant with 2 parts and total installed capacity is 30.2 MWe with an estimated amount of annual electricity generation of 241,600 MWh with an estimated annual average GHG reductions of 36,699 tCO2. The bundle consists of Kiper JES 1 which is in Aydın Province with an installed capacity of 10.2 MWe and generates 81,600 MWh of electricity on average per year resulting in 85,506 tCO2 of GHG reductions annually and Nezihe Beren JES which is in Aydın Province with an installed capacity of 20 MWe and generates 160,000 MWh of electricity on average per year resulting in 122,205 tCO2 of GHG reductions annually. Both parts are located in Türkiye. The project proponents are KÇS KAHRAMANMARAŞ ÇİMENTO BETON SANAYİ VE MADENCİLİK İŞLETMELERİ A.Ş. and MAREN MARAŞ ELK. ÜRT. SAN. VE TİC. A.Ş. and the focal which is representing the project on ICR is Kipaş Mensucat İşletmeleri A.Ş.. The project activity supplies the produced electricity to national grid. The project crediting period start date is 29/10/2020.

Validation Body

Validation Criteria
ISO 14064-2:2019
ICR requirements v6.0
Applied methodology
Verification Body

Media

Location

Country
Türkiye
City
Aydın
Address
Çamköy Mah. Çamur Mevki 7 Cad. No:1 Germencik/AYDIN/ Bereketli Mah. Bereketli Sok. No: 484 Nazilli / AYDIN
Geographical Region
N/A
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
122K
t CO₂e per year
Est. Total
611K
t CO₂e
Crediting Start Date
OCT 29 '20
Crediting Period
5 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

KCS KAHRAMANMARAŞ ÇİMENTO BETON SANAYİ VE MAD. İŞİ. A.Ş.

Project Owner

Project Proponent

People involved in the project

Murat Gökpur

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Ingest
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

1 documents

No issuance statement

1 documents

Other note

1 documents

Project description

2 documents