Maren KCS Geothermal Bundle
Maren KCS Geothermal Bundle
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
Project activity is a geothermal power plant with 2 parts and total installed capacity is 30.2 MWe with an estimated amount of annual electricity generation of 241,600 MWh with an estimated annual average GHG reductions of 36,699 tCO2. The bundle consists of Kiper JES 1 which is in Aydın Province with an installed capacity of 10.2 MWe and generates 81,600 MWh of electricity on average per year resulting in 85,506 tCO2 of GHG reductions annually and Nezihe Beren JES which is in Aydın Province with an installed capacity of 20 MWe and generates 160,000 MWh of electricity on average per year resulting in 122,205 tCO2 of GHG reductions annually. Both parts are located in Türkiye. The project proponents are KÇS KAHRAMANMARAŞ ÇİMENTO BETON SANAYİ VE MADENCİLİK İŞLETMELERİ A.Ş. and MAREN MARAŞ ELK. ÜRT. SAN. VE TİC. A.Ş. and the focal which is representing the project on ICR is Kipaş Mensucat İşletmeleri A.Ş.. The project activity supplies the produced electricity to national grid. The project crediting period start date is 29/10/2020.
Media
Location
Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Participants
Version | File size | Ingest | ||||
|---|---|---|---|---|---|---|
ICR Environmental and Socio-economic safeguards 1 documents | ||||||
Kml file 1 documents | ||||||
No issuance statement 1 documents | ||||||
Other note 1 documents | ||||||
Project description 2 documents |
Rows per page