Kıyıköy WPP Capacity Addition Project
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
The Kıyıköy WPP Capacity Addition Project is built and developed by Borusan EnBW Enerji Yatırımları ve Üretim A.Ş. The proposed project involves the installation of 20 wind turbines, each with a capacity of 3.6 MWm/3.6 MWe, making the total installed capacity addition to 72 MWm/72 MWe. The project owner built 20 more turbines in 2020 and increased the 28 MWm/27.45 MWe capacity of the existing Kıyıköy WPP to 100 MWm/99.45 MWe with its additional capacity.
Media
Location
Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Participants
Organizations involved in the project
Version | File size | Ingest | ||||
|---|---|---|---|---|---|---|
ICR Environmental and Socio-economic safeguards 1 documents | ||||||
Project description 1 documents | ||||||
Project design description and monitoring report 1 documents |