Iskur Siverek Solar Farm

Iskur Siverek Solar Farm

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Under validation
Registration Date
Jun 18, 2026
Project Developer
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Iskur Siverek Solar Farm (SF) is a large-scale Greenfield renewable type of bundled solar power plants, located in Siverek district of the province of Şanlıurfa in Türkiye with the operation start date of 06/06/2024. The purpose of the project is to provide renewable electricity to the Türkiye’s grid system through harnessing solar energy. Project aims reducing the dependency on fossil fuel-based electricity generation in Türkiye, hence reducing the local environmental pollution and contributing to combatting global climate change. Iskur Siverek SF has an installed capacity of 22 MWe, providing 62,500 MWh/year clean electricity to the national grid system, and achieving 39,130 tCO2 of emission reductions annually. Project activity is expected to achieve 391,308 tCO2 emission reductions during the 10-year crediting period.

Validation Criteria
ICR requirements v6.0
Applied methodology
ISO 14064-2:2019
Verification Body

Media

Location

Country
Türkiye
City
Şanlıurfa
Address
Yoğunca neighborhood, Siverek district.
Geographical Region
Europe
Coordinates
37.67892089426898, 39.39884149958117
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
39K
t CO₂e per year
Est. Total
391K
t CO₂e
Crediting Start Date
JUN 6 '24
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

İskur Tekstil Enerji TİC. ve SAN A.Ş.

Project Owner

Project Developer

profile picture

Ampere For Renewable Energy

Verification Body

Validation Verification Body

profile picture

SEKA CONSULTANCY LTD.

Project Developer

Broker

People involved in the project

Muharrem Başer

Project Participant
profile picture

Muharrem Başer

Project Participant

Ahmad Sarhan

Auditor

MuratK

Project Participant

Yehya Abdellatif

Auditor

Öykü Yakupoğlu

Auditor
Documents
An overview of all documents connected to this project
Version
File size
Ingest
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

3 documents

No issuance statement

2 documents

Other note

4 documents

Project description

3 documents

Project concept

1 documents

Review report

2 documents

Validation report

1 documents

Rows per page

Page 1 of 1