Iskur Siverek Solar Farm
Iskur Siverek Solar Farm
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
Iskur Siverek Solar Farm (SF) is a large-scale Greenfield renewable type of bundled solar power plants, located in Siverek district of the province of Şanlıurfa in Türkiye with the operation start date of 06/06/2024. The purpose of the project is to provide renewable electricity to the Türkiye’s grid system through harnessing solar energy. Project aims reducing the dependency on fossil fuel-based electricity generation in Türkiye, hence reducing the local environmental pollution and contributing to combatting global climate change. Iskur Siverek SF has an installed capacity of 22 MWe, providing 62,500 MWh/year clean electricity to the national grid system, and achieving 39,130 tCO2 of emission reductions annually. Project activity is expected to achieve 391,308 tCO2 emission reductions during the 10-year crediting period.
Media
Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Participants
Organizations involved in the project
Version | File size | Ingest | ||||
|---|---|---|---|---|---|---|
ICR Environmental and Socio-economic safeguards 1 documents | ||||||
Kml file 3 documents | ||||||
No issuance statement 2 documents | ||||||
Other note 4 documents | ||||||
Project description 3 documents | ||||||
Project concept 1 documents | ||||||
Review report 2 documents | ||||||
Validation report 1 documents |
Rows per page


