Orlivska Wind Farm

Orlivska Wind Farm

Please fill out the form to get in touch with the project developers.

Project Information

Est. Annual Mitigations

224,986t CO2-e

Project Status
Validated
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Orlivska Wind Farm (WF) is a renewable type of wind power plant with an operation start date of 01/10/2019, located in in Zaporizhzhia region in Ukraine. The purpose of the project is to provide renewable electricity to the Ukraine grid through harnessing wind energy. Orlivska WF is a large-scale project activity with an installed capacity of 98.8 MW, providing 349,901.15 MWh/year clean electricity to the Ukraine grid system, and achieving 224,985 tCO2 of emission reduction annually.

Validation Criteria
ISO 14064-2:2019
ICR requirements v4.0
Applied methodology
ICR requirements v5.0
Verification Criteria
ISO 14064-2:2019
ICR requirements v4.0
Applied methodology
Project design description
ICR requirements v5.0

Media

Location

Country
Ukraine
City
Address
Geographical Region
Europe
Coordinates
47.2062843579405, 34.95277891865194
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
225K
t CO2-e per year
Est. Total
2M
t CO2-e
Crediting Start Date
OCT 1 '19
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

DTEK ORLIVSKA WIND FARM LLC

Project Owner

Project Proponent

profile picture

Kilittasi Muh Mus

Project Partner

Consultancy

profile picture

Enviance Services Private

Verification Body, Validation Body

Validation Verification Body

People involved in the project

profile picture

Incigul Polat Erdogan

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Other note

2 documents

Project design description and monitoring report

1 documents

Review report

1 documents

Validation and verification report

1 documents