SIRVAN HEPP
Please fill out the form to get in touch with the project developers.
Project Information
ŞİRVAN HEPP is a new built hydroelectric power plant project with a reservoir, located in Siirt Province, Turkey owned Nas Enerji A.Ş. The generation license of the project was issued by the Energy Market Regulatory Authority (EMRA) on 15/01/2009 for 49 years. The project has an installed capacity of 31.40 MWm/30 MWe and annual generation is estimated to be 83,850 MWh. The purpose of the Project is to produce renewable electricity using hydrology as the power source and supply electricity to Turkey’s national grid to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by Turkish National electricity grid dominated by fossil fuel fired power plants. The annual emission reduction estimated by the project is 37,815 tonnes of CO2
Media
Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Participants
Organizations involved in the project
Version | File size | ||||
---|---|---|---|---|---|
Kml file 1 documents | |||||
Other note 1 documents | |||||
Project description 1 documents | |||||
Project concept 1 documents | |||||
Proof of ownership 1 documents | |||||
Review report 1 documents | |||||
Validation report 1 documents |