ID: 363
MSCI Rating

Kapidag WEPP

Please fill out the form to get in touch with the project developers.

Impacts

Rating by MSCI
AA
Low-medium risk
Top 20% of projects
CCC
B
BB
BBB
A
AA
AAA

Criteria breakdown

AdditionalityMedium risk
3.2/5
QuantificationLow risk
4.1/5
PermanenceMedium risk
3.5/5
Co-benefitsLow risk
4.0/5
Legal and ethicalLow risk
4.3/5
Delivery riskMedium risk
3.7/5

MSCI rating available

Sign in or create a free account to view this project's MSCI integrity rating and criteria breakdown.

Project Information

Project Status
Verified
Registration Date
Sep 16, 2026
Project Developer
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
AMS-I.D.
Project Description

Kapidag WEPP is a wind power plant in Balıkesir, Türkiye, with an installed capacity of 14.4 MWm / 6.85 MWe and estimated annual generation of 72,656 MWh. It aims to supply renewable electricity to the national grid, reducing estimated 227,454 tonnes of CO₂e over its crediting period while supporting local employment, economic growth, and sustainable development.

Validation Criteria
ISO 14064-2:2019
ICR requirements v6.0
Applied methodology

Media

Location

Country
Türkiye
City
Balıkesir
Address
Beşevler
Geographical Region
N/A
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
45K
t CO₂e per year
Est. Total
227K
t CO₂e
Crediting Start Date
APR 29 '21
Crediting Period
5 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

Kapıdağ Rüzgar Enerjisi Elektrik Üretim Sanayi ve Ticaret A.Ş.

Project Owner

Other

profile picture

Re Carbon Gözetim Denetim ve Belgelendirme Limited Sirketi

Verification Body, Validation Body

Validation Verification Body

profile picture

NAS ENERJİ A.Ş.

Project Developer

Project Proponent

People involved in the project

profile picture

OMER FARUK NASIROGLU

Project Participant
profile picture

Kader Alkaç

Auditor
profile picture

Ahmet Hamdi Zembil

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Ingest
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

1 documents

No issuance statement

1 documents

Other note

2 documents

Project description

2 documents

Project design description and monitoring report

1 documents

Proof of ownership

1 documents

Representation deed

1 documents

Review report

3 documents

Validation and verification report

1 documents

Rows per page

Page 1 of 1