Fernas-4 SPPis a new built solar power plant, located in Burdur Province, Turkey owned by Fergün Enerji A.Ş. The generation license of the project was issued in 30/12/2022 for 49 years. The project has an installed capacity of 34.96 MWm/20 MWe and the annual generation is estimated to be 40,000 MWh. The purpose of the Project is to produce renewable electricity using solar as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 25,044 tonnes of CO2.
Media

Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Participants
Organizations involved in the project
Version | File size | ||||
---|---|---|---|---|---|
Kml file 1 documents | |||||
Other note 1 documents | |||||
Project description 1 documents | |||||
Review report 1 documents | |||||
Validation report 1 documents |