Impacts

Project Information

Project Status
Validated
Project Developer
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Fernas-4 SPPis a new built solar power plant, located in Burdur Province, Turkey owned by Fergün Enerji A.Ş. The generation license of the project was issued in 30/12/2022 for 49 years. The project has an installed capacity of 34.96 MWm/20 MWe and the annual generation is estimated to be 40,000 MWh. The purpose of the Project is to produce renewable electricity using solar as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 25,044 tonnes of CO2.

Validation Criteria
ISO 14064-2:2019
ICR requirements v5.0
Applied methodology
Verification Body

Verification Criteria

Media

...

Location

Country
Turkey
City
Burdur
Address
CAVDIR
Geographical Region
Asia
Coordinates
38.11024547799022, 29.72063097767897
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
25K
t CO₂e per year
Est. Total
250K
t CO₂e
Crediting Start Date
OCT 29 '20
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

Fergün Enerji A.Ş.

Project Owner

Project Proponent

Sekans Energy Co

Project Developer

Project Developer

profile picture

KBS Certification Services Limited

Verification Body

Validation Verification Body

People involved in the project

profile picture

SILA DURAN

Project Participant
profile picture

OMER FARUK NASIROGLU

Project Participant

Anil Soyler

Auditor
Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

Other note

1 documents

Project description

1 documents

Review report

1 documents

Validation report

1 documents