Ipek Mobilya Solar Bundle Project
Ipek Mobilya Solar Bundle Project
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
A bundle project of Ipek Mobilya Roof PV with an installed capacity of 1.5 MWe installed on the rooftops of Ipek Mobilya Facilities with an estimated amount of annual electricity generation of 2,129,200 kWh, Cinkom 1 PV with an installed capacity of 9.9 MWe and annual electricity production of 18,928,789 kWh and Cinkom 2 PV with an installed capacity of 20.0 MWe and annual electricity production of 385,310,000 kWh. All projects supply the produced electricity to national grid
Media





Sustainable Developement Goals

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Participants
Organizations involved in the project
Version | File size | ||||
---|---|---|---|---|---|
Kml file 1 documents | |||||
Other note 1 documents | |||||
Project description 3 documents | |||||
Review report 2 documents | |||||
Validation report 2 documents |
Rows per page