ICR
Under development
ID: 321

Iskur Siverek Solar Farm

Iskur Siverek Solar Farm

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Under development
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Iskur Siverek Solar Farm (SF) is a large-scale (22 MWe) Greenfield renewable solar power plant, located in Şanlıurfa, Türkiye. The purpose of the project is to provide renewable electricity to the national grid through harnessing solar energy. Starting operation on 06/06/2024, the project provides 62,500 MWh/year electricity to the national grid, achieving 39,655 tCO2 of emission reductions annually.

Validation Criteria
Verification Body

Verification Criteria

Media

Location

Country
Turkey
City
Şanlıurfa
Address
Yoğunca neighborhood, Siverek district.
Geographical Region
Europe
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
40K
t CO₂e per year
Est. Total
397K
t CO₂e
Crediting Start Date
JUN 6 '24
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

İskur Tekstil Enerji TİC. ve SAN A.Ş.

Project Owner

Project Proponent

profile picture

Ampere For Renewable Energy

Verification Body

Validation Verification Body

People involved in the project

Muharrem Başer

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

Project description

1 documents