ICR
Validated
ID: 389

İzdemir Solar Power Plant

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Validated
Registration Date
Mar 24, 2026
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

İzdemir Solar Power Plant Project comprises of three unlicensed units in Manisa, Türkiye, with a total capacity of 143.183 MWe / 161.24982 MWm. The project delivers renewable electricity to the national grid, reducing reliance on fossil fuels. It is expected to generate 252,264 MWh annually and mitigate approximately 157,942 tCO₂e of emissions per year, totaling 1,579,428 tCO₂e over the 10-year crediting period.

Validation Criteria
ISO 14064-2:2019
ICR requirements v6.0
Applied methodology
Verification Body

Verification Criteria

Media

...

Location

Country
Turkey
City
manisa
Address
Hacıköseli Neighborhood, Salihli District
Geographical Region
N/A
Coordinates
38.64689406108456, 28.42651886640621
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
158K
t CO₂e per year
Est. Total
2M
t CO₂e
Crediting Start Date
APR 1 '24
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

İzdemir Enerji Elektrik Üretim A.Ş.

Project Owner

Project Proponent

profile picture

QSI Belgelendirme Muayene Ve Test Hizmetleri Ltd. Şti.

Verification Body

Validation Verification Body

profile picture

Desilyon Danismanlik Ticaret A.S.

Project Developer

Consultancy

People involved in the project

Süleyman Daban

Project Participant

Bengi Çetinel

Auditor
profile picture

Desilyon Danışmanlık Tic AŞ

Project Participant

Özlem Özkapı

Project Participant

Göksu Yurtseven

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

1 documents

No issuance statement

1 documents

Other note

2 documents

Project description

1 documents

Review report

2 documents

Validation report

1 documents

Rows per page

Page 1 of 1