KEAS GEBZE BIOMASS & ADANA SOLAR BUNDLE PROJECT

KEAS GEBZE BIOMASS & ADANA SOLAR BUNDLE PROJECT

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Under validation
Project Developer
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
AMS-I.D.
Project Description

Project activity is a bundle project of KEAS Adana Solar Power Project with an installed capacity of 0.99 MWe installed on the rooftops of KEAS Adana Facility with an estimated amount of annual electricity generation of 1750884 kWh and KEAS Gebze Biomass Project which utilizes biomass wastes from KEAS’s Gebze Facilitiy’s industrial process, which includes wood byproducts and wastes, for gasification and production of electricity with a capacity of 0.995 MWe and annual electricity production of 6,680,000 kWh. Both projects supply the produced electricity to national grid.

Validation Criteria
ICR requirements v4.0
Applied methodology
Verification Body

Verification Criteria

Media

Location

Country
Turkey
City
Kocaeli & Adana
Address
Project activity is located in two different provinces, Kocaeli and Adana
Geographical Region
Europe
Coordinates
40.79747196364612, 29.42993000784264
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
5K
t CO₂e per year
Est. Total
52K
t CO₂e
Crediting Start Date
JAN 15 '15
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

Kastamonu Entegre Agac San. Ve Tic. A.S.

Project Owner

Project Proponent

profile picture

Goldstein Carbon

Project Developer

Project Developer

profile picture

KBS Certification Services Limited

Verification Body

Validation Verification Body

People involved in the project

Tugce Kiratli

Auditor
profile picture

Yigit Gungor

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

Project description

1 documents