Project Status
Verified
Registration Date
Sep 29, 2024
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Kitka Wind Power Project is a wind power generation project with the installed capacity of 32.4 MW. An estimated electricity net generation of 95,600 MWh by utilization of the available wind energy by project activity will replace the grid electricity, which is constituted of mainly fossil fuels. The electricity produced by project activity will result in a total emission reduction of 98,659 tonnes of CO2e/year and 986,590 tonnes of CO2 for the 10 years crediting period.

Validation Criteria
ISO 14064-2:2019
Applied methodology
ICR requirements v5.0

Media

...
...
...

Location

Country
Kosovo
City
Gjilan
Address
Isa Boletini Nn.
Geographical Region
Europe
Coordinates
42.65167359160284, 21.67164354989615
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
99K
t CO₂e per year
Est. Total
987K
t CO₂e
Crediting Start Date
OCT 11 '18
Crediting Period
10 Years

Sustainable Developement Goals

Clean Water and Sanitation

Ensure availability and sustainable management of water and sanitation for all

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

Air Energy SH. P. K.

Project Owner

Project Proponent

profile picture

Life İklim ve Enerji Ltd. Şti.

Project Developer

Project Developer

profile picture

Re Carbon Gözetim Denetim ve Belgelendirme Limited Sirketi

Verification Body, Validation Body

Validation Verification Body

People involved in the project

Kader Alkaç

Auditor

Khalid Mahmood

Auditor

Beyda Altuntaş

Auditor

Mehmet Aydoğdu

Project Participant

İrem Taşkıran

Auditor
profile picture

Kerem Aslan

Project Participant
profile picture

Ramazan Aslan

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

2 documents

Monitoring report

1 documents

No issuance statement

1 documents

Other note

1 documents

Project description

1 documents

Review report

3 documents

Validation report

1 documents

Verification report

1 documents

Rows per page

Page 1 of 1