Kitka Wind Power Project
Kitka Wind Power Project
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
Kitka Wind Power Project is a wind power generation project with the installed capacity of 32.4 MW. An estimated electricity net generation of 95,600 MWh by utilization of the available wind energy by project activity will replace the grid electricity, which is constituted of mainly fossil fuels. The electricity produced by project activity will result in a total emission reduction of 98,659 tonnes of CO2e/year and 986,590 tonnes of CO2 for the 10 years crediting period.
Media



Sustainable Developement Goals

Clean Water and Sanitation
Ensure availability and sustainable management of water and sanitation for all

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Participants
Organizations involved in the project
Version | File size | ||||
|---|---|---|---|---|---|
ICR Environmental and Socio-economic safeguards 1 documents | |||||
Kml file 2 documents | |||||
Monitoring report 1 documents | |||||
No issuance statement 1 documents | |||||
Other note 1 documents | |||||
Project description 1 documents | |||||
Review report 3 documents | |||||
Validation report 1 documents | |||||
Verification report 1 documents |
Rows per page

