Makres Solar Power Plant
Makres Solar Power Plant
Please fill out the form to get in touch with the project developers.
Project Information
“Makres Solar Power Plant” is operated by “Makres Enerji A.Ş.” and located in Antalya Province, in the Mediterranean Region of Türkiye. The purpose of the project activity is to provide renewable electricity to the Turkish grid through solar energy. The total installed capacity is 4.8 MWe. According to the provisional acceptance documents of the SPPs, the start date of the project activity is 14/11/2017. The estimated annual electricity generation of the project activity is 9,620 MWh.
Media

Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Level 5 additionality
Policy additionality. Implementation of actions may lie out of the scope of the host country's Nationally Determined Contributions under the Paris Agreement and, therefore, not eligible for international transfer mechanism. When project implementation goes beyond its host country’s climate objectives and lies outside of the scope of its climate action strategy towards its NDCs, it is considered to be policy additional.
Participants
Organizations involved in the project
Version | File size | ||||
---|---|---|---|---|---|
Kml file 1 documents | |||||
Other note 6 documents | |||||
Project description 1 documents | |||||
Proof of ownership 1 documents | |||||
Representation deed 1 documents | |||||
Review report 1 documents | |||||
Validation report 1 documents |
Rows per page