ICR
Under validation
Peshqeshit HEPP 3
Please fill out the form to get in touch with the project developers.
Project Information
Est. annual mitigations
33,017t CO2-e
Project Status
Under validation
Project Type
Hybrid both
Sector
Energy industries
Methodology
ACM0002
Project Description
Peshqeshit HEPP 3 (hereafter referred as the “project activity”) is constructed Hydro Electricity Power Plant (HPP) which was developed by AYEN AS ENERGJI SHA (hereafter referred as the “project participant” or “project owner”) on the Fani i Madh and Fani i Vogel rivers Stream, within the jurisdiction of Reps, Mirditë, Albania.
Validation Body
Validation Criteria
ICR requirements v4.0
ISO 14064-2:2019
Applied methodology
Validation Criteria
ICR requirements v4.0
Applied methodology
Project design description
ISO 14064-2:2019