PLASTIMAK Solar Power Project based in Türkiye
PLASTIMAK Solar Power Plant Project
Please fill out the form to get in touch with the project developers.
Impacts
Project Information
Plastimak Solar Power Plant Project is a small-scale grid connected renewable electricity generation project developed by Plastimak Plastik Profil Enjeksiyon Sanayi Ticaret A.Ş. Project is located in Konya province of Türkiye with installed capacity of 5,230kWe / 6,280kWp planned to generate 11,382MWh average annual electricity energy feed in to Turkish National grid. Project contributes to estimated GHG emission reduction 7,222tCO2/year by utilizing Solar Power as renewable energy generation.
Media
Location
Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2b additionality
Non-enforcement additionality. Projects are non-enforcement additional if their implementation and/or operation is mandated by local legislation or regulation but are systematically not enforced by authorities in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Level 4a additionality
Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.
Level 5 additionality
Policy additionality. Implementation of actions may lie out of the scope of the host country's Nationally Determined Contributions under the Paris Agreement and, therefore, not eligible for international transfer mechanism. When project implementation goes beyond its host country’s climate objectives and lies outside of the scope of its climate action strategy towards its NDCs, it is considered to be policy additional.
Participants
Organizations involved in the project
Version | File size | Ingest | ||||
|---|---|---|---|---|---|---|
ICR Environmental and Socio-economic safeguards 1 documents | ||||||
Kml file 1 documents | ||||||
Other note 2 documents | ||||||
Project description 1 documents |