ICR
Validated
ID: 207

Pokrovska Solar Farm

Pokrovska Solar Farm

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Validated
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

Pokrovska Solar Farm (SF) is a renewable type of solar power plant with an operation start date of 01/10/2019, located in in Dnipropetrovsk region in Ukraine. The purpose of the project is to provide renewable electricity to the Ukraine grid through harnessing solar energy. Pokrovska SF is a large scale project activity with an installed capacity of 240 MW, providing 353,723.82 MWh/year clean electricity to the Ukraine grid system, and achieving 227,443 tCO2 of emission reduction annually.

Validation Criteria
ICR requirements v4.0
ISO 14064-2:2019
Applied methodology
ICR requirements v5.0
Verification Criteria
ISO 14064-2:2019
ICR requirements v4.0
Applied methodology
Project design description
ICR requirements v5.0

Media

...
...
...
...
...

Location

Country
Ukraine
City
Nikopol district
Address
Complex of buildings and structures, No 1, Pokrovsk village council
Geographical Region
Europe
Coordinates
48.27140401728096, 33.70119792583264
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
227K
t CO₂e per year
Est. Total
2M
t CO₂e
Crediting Start Date
OCT 1 '19
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

profile picture

D.Trading International SA

Project Owner

Project Proponent

profile picture

Kilittasi Muh Mus

Project Partner

Consultancy

profile picture

Enviance Services Private

Verification Body, Validation Body

Validation Verification Body

People involved in the project

Dmytro Fedotov

Project Participant
profile picture

Serhiy Yeromin

Project Participant
profile picture

Hanna Honcharova

Project Participant
profile picture

Incigul Polat Erdogan

Project Participant
profile picture

Serhiy Y

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
Other note

4 documents

Project design description and monitoring report

2 documents

Project concept

1 documents

Review report

3 documents

Validation and verification report

2 documents

Rows per page

Page 1 of 1