Solar Power Project By TP Saurya Limited

Please fill out the form to get in touch with the project developers.

Impacts

Project Information

Project Status
Verified
Registration Date
Jul 09, 2025
Project Owner
Project Developer
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

The Project Activity is a solar power project that supplies clean electricity to the Indian Grid. The Project Activity started its commercial operation on 08/11/2024 and is located in Neemuch Solar Park of the Singoli Tehsil at the Neemuch District of Madhya Pradesh State in India. The purpose of the project is to provide renewable electricity to the Indian grid through harnessing solar energy. Project aims reducing the dependency on fossil fuel based electricity generation in India, hence reducing the local environmental pollution and contributing to combatting global climate change.

Validation Criteria
ICR requirements v6.0
ISO 14064-2:2019
Applied methodology
Verification Criteria
ICR requirements v6.0
ISO 14064-2:2019
Applied methodology

Media

Location

Country
India
City
Neemuch
Address
Kawai village, Singoli tehsil
Geographical Region
N/A
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
685K
t CO₂e per year
Est. Total
7M
t CO₂e
Crediting Start Date
NOV 8 '24
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Participants

An overview of all the people and organizations associated to this project. Participants, validators, verification bodies and other.

Organizations involved in the project

TP Saurya Limited

Project Owner

Project Proponent

profile picture

Enviance Services Private

Verification Body, Validation Body

Validation Verification Body

TP Saurya Limited

Project Developer

Project Proponent

profile picture

Tata Power Renewable Energy Limited

Project Partner

Project Proponent

People involved in the project

profile picture

Prashant Kumar Tiwari

Project Participant
profile picture

Vipul jain

Auditor
profile picture

Nayakallu Anil Kumar

Project Participant
Documents
An overview of all documents connected to this project
Version
File size
ICR Environmental and Socio-economic safeguards

1 documents

Kml file

1 documents

No issuance statement

1 documents

Other note

2 documents

Project design description and monitoring report

1 documents

Review report

1 documents

Validation and Verification Plan

1 documents

Validation and verification report

1 documents

Rows per page

Page 1 of 1